Two days of work by a team of four guys. The work needs to be inspected and the power company needs to change out our meter and we'll be good to go. We'll be generating at a max rate of 7.42 kW!
New electrical box, meter, internet connection, and switch in the basement:
Microinverters (DC to AC) under each panel:
There's also a switch outside the house so the electric company can shut off our solar if they need to work on the power lines in the neighborhood!